What is your target or electrical resistance (MΩ)?
Turn on the main power switch. The indicator light should illuminate.
Removable metal disks located on the bottom assembly that dictate the primary tensile force applied during the second stage pull. 3. The Two-Stage Pulling Mechanism Explained
Loosen the upper and lower clamping knobs on the vertical sliding mechanism. narishige pc10 manual new
This guide serves as a detailed manual supplement for new users or those seeking a refresher on the operation, theory, and maintenance of the Narishige PC-10.
Set the Heater No. 1 and Heater No. 2 dials according to your glass type. Note: Always start with lower values and gradually increase them to protect the platinum coil from burning out. Step 5: Execute the Pull
Controls the electrical current delivered to the platinum coil. Higher numbers increase the temperature. What is your target or electrical resistance (MΩ)
The platinum heater is a consumable part. Over time, it will oxidize or break.
Gradually increase the Heater 1 and Heater 2 dials in small increments. Heater settings are too high.
Remove the finished pipettes vertically to prevent touching the ultra-fragile tips against the metal frame or heating coil. Removable metal disks located on the bottom assembly
Adjust the dial to a slightly lower or higher setting depending on the desired taper smoothness.
Ensure the auxiliary weights are attached if your protocol requires extra pulling force.
The Narishige PC-10 has a wide range of applications in various fields, including:
: Compatible with borosilicate glass capillaries, such as the Narishige GD-1 with internal filaments. 3. Calibration & Setup (Manual Guidelines)
Wipe down the vertical slider tracks weekly to prevent dust buildup from adding friction to the gravity drop.