Proceq Profometer 4 Manual !link!
Follow this standard workflow to configure the device, locate reinforcement, and log accurate measurements. Step 3.1: Pre-Operational Setup and Zeroing
Up to 120 mm (4.75 inches) depending on rebar size. proceq profometer 4 manual
Measure the exact cover depth using a known reference point, or use the device's built-in diameter determination mode. Place the probe parallel to the rebar. Select the on the selection switch. Follow this standard workflow to configure the device,
Scaffolding, tie wires, window frames, and personal protective equipment (like steel-toed boots or watches) must be kept away from the probe during scanning. 6. Maintenance, Storage, and Troubleshooting Troubleshooting Common Issues Potential Cause Corrective Action Instrument drifts from zero rapidly Low battery voltage or extreme temperature change Place the probe parallel to the rebar
The Profometer 4 can be upgraded to assess the corrosion likelihood of reinforcing steel using the half-cell potential method. This technique measures the electrochemical potential between a reference electrode and the embedded steel. This measurement helps identify areas with a higher probability of active corrosion.